Juniper Networks 8 Manuel d'utilisateur Page 114

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 183
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 113
ERX 8.0.x Hardware Guide
Figure 42: Installing an SFP on a GE I/O Module
g013437
TX and RX markings on I/O module
Connection circuitry on base of SFP
4. Insert th
eSFPintotheI/Omoduleuntilitclicksintoplace.
IftheSFPdoesnotslidesmoothlyintotheI/Omodule,makesurethatthe
orientat
ion of the SFP is correct.
5. Gently pull the SFP to confirm that it is inserted correctly.
If the SF P com es out of the slot when you pull it, repeat Step 4.
6. Remove th
e dust cover that protects the ports.
7. Connect the new cables to the SFP.
If you are using the redundant port on the GE I/O module, repeat
Steps 2–7 for the other port.
96 Replacing SFPs on I/O Modules
Vue de la page 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 182 183

Commentaires sur ces manuels

Pas de commentaire