Juniper-networks ERX-1410 Manuel d'utilisateur Page 153

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 184
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 152
D
Preparing Your Site
This chapter provides information about preparing your site before
installing the ERX system. We recommend that you consider all
requirements and specifications indicated in this appendix before
installing the system.
Your Preinstallation Responsibilities
Complete the following tasks before installing the system:
Verify that the electrical supply meets all AC and DC power
requirements. See Appendix A, System Specifications.
Verify that the site meets all environment specifications. See
Environmental Requirements later in this chapter and Appendix A,
System Specifications.
Verify that the cables you plan to use meet the specifications, and
review the cabling recommendations. See Cabling Recommendations
later in this appendix.
Verify the operation of all telephone circuits, digital services, and T1
facilities required for installation.
Topic Page
Your Preinstallation Responsibilities D-1
Environmental Requirements D-2
Safety Guidelines D-2
Rack Requirements D-3
Cabling Recommendations D-7
Vue de la page 152
1 2 ... 148 149 150 151 152 153 154 155 156 157 158 ... 183 184

Commentaires sur ces manuels

Pas de commentaire